| PROYEK YANG TELAH DISELESAIKAN | |||||
| NO | PROYEK | KLIEN | TAHUN | PEKERJAAN | NILAI PEKERJAAN |
| 1 | HP Metal | Averbrige - Ngoro | 2004 | Pengadaan Panel LVMDP & Capasitor Bank | Rp 315.000.000 |
| 2 | PT. Pabrik Kertas Tjiwi Kimia | PT. Varia Usaha | 2005 | Panel Control Loading, Panel PCC | Rp 98.841.000 |
| 3 | Pabrik Tekstil Probolinggo | PT. Eratex Djaja | 2005 | Pembuatan Panel ACB | Rp 49.176.000 |
| 4 | Surabaya Airport | TPK WASA J.O | 2005 | Rental of Dummy Load | Rp 45.000.000 |
| 5 | PT. Gudang Garam (Gempol) | PT. KPE | 2005 | Pek. Inst. Penerangan & Stop Kontak | Rp 548.674.150 |
| Engineering Building & Driving Range | |||||
| 6 | PT. Gudang Garam (Gempol) | PT. KPE | 2005 | Kerja Tambah Driving Range 1,2,3,4,5 | Rp 100.960.100 |
| 7 | PT. Gudang Garam (Gempol) | PT. KPE | 2005 | Kerja Tambah Instalasi Penerangan dan Stop | Rp 100.600.000 |
| Kontak Engineering Building | |||||
| 8 | PT. Nankai Indonesia | PT. Nankai | 2006 | Pengadaan dan Pemasangan Panel, Instalasi | Rp 938.954.500 |
| Power dan Penerangan | |||||
| 9 | PT. P K U (Astra Sawit) | PT. Dwi Wira | 2006 | Proyek Pabrik Kelapa Sawit | Rp 1.100.000.000 |
| 10 | PG. Kebon Agung | Sinar Bentala Mas | 2006 | Panel LV MDP 5000A | Rp 581.200.000 |
| 11 | PT. Pasang Kayu (Palu) | PT. PKT | 2006 | Panel dan instalasi power. | Rp 830.000.000 |
| Instalasi motor dan kontrol mesin. | |||||
| 12 | Jembatan Merah Plasa | PT. JASAMITRA | 2006 | Pemasangan Trafo Distribusi | Rp 14.000.000 |
| PROPERTINDO | |||||
| 13 | Proyek Tarakan - Kalimantan | PT. IDEC ABADI | 2006 | Auto Transformator Step Down | Rp 12.500.000 |
| WOOD INDUSTRIES | |||||
| 14 | Dunia Salju - Giant | CV. Indomas | 2006 | Instalasi Pemasangan Trafo 630KVA | Rp 120.000.000 |
| 15 | PG. Jombang | PT. HMS | 2006 | Panel ACB & MV | Rp 250.000.000 |
| 16 | PT. Varia Usaha | PT. Varia Usaha | 2006 | Panel Medium Voltage 24KV | Rp 236.091.625 |
| Panel Low Voltage | |||||
| 17 | Pabrik Tekstil Probolinggo | PT.Eratex Djaja Tbk | 2006 | Instalasi KWH Meter 20KVA | Rp 10.508.000 |
| 18 | PT. Eratex Djaja Tbk. | PT.Eratex Djaja Tbk | 2006 | Perbaikan GCB 24KV | Rp 62.500.000 |
| 19 | Team Module | Team Module | 2006 | Supply Electrical Panels for Construction | Rp 83.000.000 |
| Camp | |||||
| 20 | Team Module | Team Module | 2006 | Additional Material Cable Gland for Main Camp | Rp 19.076.500 |
| 21 | Team Module | Team Module | 2006 | Additional Electrical Panel for Construction | Rp 18.474.595 |
| Camp | |||||
| 22 | Team Module | Team Module | 2006 | Panel Listrik Tangguh Shore Base | Rp 504.500.000 |
| 23 | Team Module | Team Module | 2006 | Material Tambahan (Main Camp) | Rp 12.065.000 |
| 24 | Team Module | Team Module | 2006 | Panel P-DOL, P-QO, P-SO | Rp 52.500.000 |
| 25 | Team Module | SPLN | 2006 | Baboo Power House | Rp 305.351.000 |
| 26 | Lumajang Halchery | PT. Mentari Timur | 2006 | Grounding | Rp 27.500.000 |
| 27 | Mall Galaxy | PT. Sinar Galaxy | 2006 | Pengadaan Relay Over Current, Auxilliary | Rp 21.480.000 |
| Contact, Inverter 220VAC | |||||
| 28 | PT. Pakerin | PT. Pakerin | 2006 | Pengadaan dan Pemasangan Panel | Rp 106.000.000 |
| (Panel Distribusi Water Treatment) | |||||
| 29 | PT. Naga Maseltraditama | PT. Naga Mas | 2006 | Panel Star Delta 75Hp & 125Hp | Rp 21.060.000 |
| 30 | PT. Sempana | PT. Sempana | 2006 | Pengadaan dan Pemasangan Panel | Rp 39.250.000 |
| 31 | PT. ECCO INDONESIA | PT. KPE | 2006 | Mekanical Electrical | Rp 1.996.143.149 |
| 32 | PT. Gudang Garam (Gempol) | PT. KPE | 2006 | Pek. Inst. Penambahan Kabel & Sensor di | Rp 15.149.000 |
| Conveyor Mechanical Feeding SKM Phase I | |||||
| 33 | PT. Asahimas Flat Glass Tbk | PT. KPE | 2006 | Installation Instrument of Natural Gas | Rp 140.318.999 |
| Sidoarjo Factory | Combustion Works | ||||
| 34 | PT. SIDOREJO PLASTIK | PT. Sidorejo Plastik | 2006 | Panel Kapasitor | Rp 16.500.000 |
| 35 | PT. Prospek Karyatama | PT. Charoen Pokphand | 2006 | Panel Indoor 80x60x20 | Rp 54.450.000 |
| 36 | PT. SMELTING - Gresik | PT. Taiyo Sinar Raya | 2006 | Electric Works (Power Shut Down) | Rp 9.900.000 |
| 37 | PT. HM Sampoerna Tbk | PT. Taiyo Sinar Raya | 2006 | Electric Works | Rp 4.565.000 |
| Pasuruan - Jawa Timur | |||||
| 38 | PT. MALINDO | PT. MENTARI TIMUR | 2006 | Pengadaan dan Pemasangan Grounding | Rp 22.500.000 |
| Penangkal Petir | |||||
| 39 | PT. Gudang Garam (Gempol) | PT. KPE | 2006 | Pek. Inst. Listrik Power di Gedung ESS | Rp 117.495.000 |
| (Gudang B-C) + Kerja Tambah | |||||
| 40 | PT. Gudang Garam (Gempol) | PT. KPE | 2006 | Pek. Inst. Power Rebuild Packer Maker & | Rp 70.350.000 |
| Ruang Training di Gedung Engineering | |||||
| 41 | PT. Gudang Garam (Gempol) | PT. KPE | 2006 | ● Pek. Inst. Penerangan Stop Kontak Rumah | Rp 25.828.500 |
| Jaga & Kandang di Driving Range | |||||
| ● Pemasangan Inst. Pompa Air di Lap. Golf | |||||
| Driving Range | |||||
| 42 | PT. VARIA USAHA | PT. VARIA USAHA | 2006 | Panel LP-01/1 MPF 2 | Rp 6.699.000 |
| 43 | PT. Gudang Garam (Gempol) | PT. KPE | 2006 | Pek. Inst. Power Mesin Packer B04 SKM I & | Rp 4.123.000 |
| Mesin Maker C02 SKM 2 | |||||
| 44 | PT. Gudang Garam (Gempol) | PT. KPE | 2006 | Pek. Inst. Mesin Weight Belt Feeding SKM 3 | Rp 3.312.500 |
| Area E3 | |||||
| 45 | PT. Gudang Garam (Gempol) | PT. KPE | 2006 | Inst. Listrik Feeder Dumper & Conveyor Silo | Rp 39.196.250 |
| Blend di Gedung V + Kerja Tambah | |||||
| 46 | PT. Gudang Garam (Gempol) | PT. KPE | 2006 | Instalasi Pembongkaran & Pemasangan Mesin | Rp 15.721.000 |
| Mechanical Feeding SKM V ( Line I3, I4, J3, J4 ) | |||||
| 47 | PT. KEDAWUNG SETIA | PT. KPE | 2006 | Pekerjaan Grounding | Rp 59.726.200 |
| 48 | PT. Gudang Garam (Kediri) | PT. KPE | 2006 | Instalasi Pemasangan Power Compressor dan | Rp 8.000.000 |
| Boiler Clove Cleaning Unit IX | |||||
| 49 | PT. Gudang Garam (Gempol) | PT. KPE | 2006 | Bongkar Pasang Instalasi Listrik Mesin Delphi | Rp 21.428.500 |
| Area Silo Blend Fase 1 & SKM IV | |||||
| 50 | PT. Gudang Garam (Gempol) | PT. KPE | 2006 | Pek. Inst. Listrik AHU Rebuild di Engineering | Rp 18.033.500 |
| Building | |||||
| 51 | PT. Charoen Pokphand | PT. Charoen | 2006 | Instalasi Aiphone | Rp 5.475.000 |
| 52 | PT. Charoen Pokphand | PT. Charoen | 2006 | Pek. Inst. Penerangan, Stop Kontak, AC dan | Rp 36.300.000 |
| Inst. Grounding | |||||
| 53 | PT. Eratex Djaja Tbk | PT.Eratex Djaja Tbk | 2006 | Pengadaan ACB 2500A 3P + Jasa Pemasangan | Rp 31.000.000 |
| 54 | CV. Adyaksa Electric | CV. Adyaksa | 2007 | Panel Capasitor Bank | Rp 44.305.000 |
| 55 | UD. PRADNYA TEKNIK | UD. PRADNYA | 2007 | Pengadaan Panel-Panel Indoor | Rp 5.850.000 |
| 56 | PT.Sarana Baja Ragam Citra | PT. SBRC | 2007 | Pemasangan Kabel Power | Rp 1.675.000 |
| 57 | PT.Sarana Baja Ragam Citra | PT. SBRC | 2007 | Panel dan Instalasi Power | Rp 17.500.000 |
| 58 | CV. SEJATI | CV. SEJATI | 2007 | Panel Star Delta 15KW & Kabel Power | Rp 4.125.000 |
| 59 | Gedung BHP | PT. SBRC | 2007 | Pengadaan & Pemasangan Accessories ACB | Rp 6.500.000 |
| 1250A | |||||
| 60 | PT. Bisi Internasional | Charoen Pophand | 2007 | Electrical Control Panel System | Rp 122.000.000 |
| 61 | Farm CP7 - Jombang | PT. CPJF | 2007 | Panel Capasitor Bank 330Kvar | Rp 76.560.000 |
| 62 | PT. Charoen Pokphand | PT. CPJF | 2007 | Inst. Listrik Ruang Basement & Lt. 1 serta | Rp 36.300.000 |
| Pos Keamanan di Gedung Laboratorium | |||||
| 63 | PT. Eratex Djaja Tbk | PT.Eratex Djaja Tbk | 2007 | Perbaikan & Bongkar Pasang Trafo 1600KVA | Rp 19.085.000 |
| 64 | SPLN | SPLN | 2007 | Pow-R-Con Display & Programing | Rp 14.000.000 |
| 65 | PT. Charoen Pokphand | PT. CPJF | 2007 | Inst. Jaringan Telephone & Airphone | Rp 6.022.500 |
| 66 | Team Module | Team Module | 2007 | Panel Shelter | Rp 1.200.000 |
| 67 | Team Module | Team Module | 2007 | Panel Control Hydraulic | Rp 1.700.000 |
| 68 | Taman Safari III (Bali) | CV. UDIN JAYA | 2007 | Pengadaan Panel-Panel | Rp 1.635.000.000 |
| 69 | PT. Eratex Djaja Tbk | PT.Eratex Djaja Tbk | 2007 | Perbaikan Trafo 2000KVA | Rp 48.250.000 |
| 70 | PT. Pabrik Kertas Tjiwi Kimia | PT. VARIA USAHA | 2007 | Pengadaan Panel LP01 & LP02 | Rp 8.500.000 |
| 71 | PT. Varia Usaha | PT. Varia Usaha | 2007 | Junction Box | Rp 550.000 |
| 72 | PT. Eratex Djaja Tbk | PT.Eratex Djaja Tbk | 2007 | GCB 20KV + Over Current Relay | Rp 62.500.000 |
| 73 | PT. Gudang Garam (Gempol) | PT. KPE | 2007 | Inst.Penerangan & Stop Kontak Guard House | Rp 79.565.500 |
| 74 | PT. Gudang Garam (Gempol) | PT. KPE | 2007 | Pembongkaran Inst. Listrik Vas Cooler Line | Rp 12.730.500 |
| HDT-LE700 Virginia & Pemasangan Inst.Pene- | |||||
| rangan di Loosening Phase I | |||||
| 75 | PT. Pabrik Kertas Tjiwi Kimia | PT. VARIA USAHA | 2007 | Panel SDP-01/1-CTV4 | Rp 21.600.000 |
| 76 | PT. Naga Maseltraditama | PT. Naga Mas | 2007 | Panel Cooling Tower 90KW | Rp 10.000.000 |
| 77 | PT. Duta Reka Bumi | PT. Duta Reka Bumi | 2007 | Panel KWH & ACPDB | Rp 17.500.000 |
| 78 | CV. Kharisma Mataram Putra | CV. Kharisma | 2007 | Panel MDP 150KVA + Raychem | Rp 20.190.000 |
| 79 | PT. METALCO | PT. METALCO | 2007 | Panel Cooling Tower, Water Pump, Incoming | Rp 119.856.240 |
| 80 | PT. METALCO | PT. METALCO | 2007 | Panel Star Delta 37KW | Rp 8.871.660 |
| 81 | PT. Gudang Garam (Gempol) | PT. KPE | 2007 | Pemasangan Ultrasonik Sensor di Silo 5410 | Rp 6.053.000 |
| Area Clove Phase I | |||||
| 82 | PT. Gudang Garam (Gempol) | PT. KPE | 2007 | Perbaikan dan Modifikasi Tray di Area Panel | Rp 9.697.500 |
| 706 Clove Process Pengolahan Phase I | |||||
| 83 | PT. Gudang Garam (Gempol) | PT. KPE | 2007 | Perbaikan Lampu Main Office & Lampu Jalan | Rp 11.774.500 |
| 84 | Pabrik Pupuk Hayati | PT. AJG | 2007 | Panel MCC | Rp 45.000.000 |
| 85 | PT. Gudang Garam (Gempol) | PT. KPE | 2007 | Inst. Penerangan & Stop Kontak Loading Dock | Rp 25.540.000 |
| di Silo Bland & Gudang C dan Inst. Lampu | |||||
| Cooling Tower Chiller di Gedung Utility Phase I | |||||
| 86 | PT. Gudang Garam (Gempol) | PT. KPE | 2007 | Bongkar Pasang Inst. Mesin Delphi Area Silo | Rp 15.041.250 |
| Bland Fase I & SKM IV | |||||
| 87 | PT. Gudang Garam (Gempol) | PT. KPE | 2007 | Pemasangan Inst. Listrik Vas Cooler Area | Rp 39.846.500 |
| Tobacco Process Phase I & Bongkar Pasang | |||||
| Inst. Mesin Cycloon Area Utility Phase I | |||||
| 88 | PT. Gudang Garam (Gempol) | PT. KPE | 2007 | Pembongkaran Inst. Listrik VAS Cooler Line | Rp 16.436.000 |
| HDT-LE700 Virginia & Pemasangan Instalasi | |||||
| Penerangan Di Loosening Phase I | |||||
| 89 | Petrokokas PT. AJG | PT. AJG | 2007 | Power Panel Indoor | Rp 12.500.000 |
| 90 | PT. Gudang Garam (Gempol) | PT. KPE | 2007 | Pemasangan Instalasi Listrik Level Control | Rp 13.419.500 |
| Pompa SSK Danau & Pemasangan Instalasi | |||||
| Listrik Exhaust Fan Ducting Area Gudang B | |||||
| (ESS) | |||||
| 91 | Pabrik Es Gresik | Pabrik Es Gresik | 2007 | Panel Capasitor Bank | Rp 15.000.000 |
| 92 | PMG - Galvalindo | PT. Josimmi | 2007 | Panel KWH + Panel ACPDB | Rp 12.000.000 |
| 93 | PG. Trangkil | Sinar Bentala Mas | 2007 | Panel LV MDP 5000A | Rp 603.900.000 |
| 94 | PT. Duta Reka Bumi | PT. Duta Reka Bumi | 2007 | Pengadaan Kabel & Lampu Taman | Rp 1.625.500 |
| 95 | Petrokokas PT. AJG | PT. AJG | 2007 | Pengadaan Kabel-Kabel | Rp 7.614.400 |
| 96 | Mall Galaxy | PT. Sinar Galaxy | 2007 | Pengadaan dan Pemasangan ACB 5000A | Rp 128.039.000 |
| 97 | PT. Rajawali Solusindo | PT. Rajawali Solusindo | 2007 | Pengadaan Panel Box | Rp 3.320.000 |
| 98 | PT. Pabrik Kertas Tjiwi Kimia | PT. Varia Usaha | 2007 | Panel SDP-02/1.CTV.1A | Rp 47.500.000 |
| 99 | PT. Bisi Internasional | PT. Bisi Internasional | 2007 | Panel ATS-AMF + Commisioning | Rp 20.050.000 |
| 100 | PT. Bisi Internasional | PT. Bisi Internasional | 2007 | Capasitor Bank 300Kvar | Rp 45.000.000 |
| 101 | PT. Pabrik Kertas Tjiwi Kimia | PT. Varia Usaha | 2007 | Panel SP-01/1-SPE-PM.5 | Rp 37.543.000 |
| 102 | Hotel Nusa Dua Beach & Spa | PT. TSP | 2007 | Pek. Upgrading Sistem Chilled Water & Hot | Rp 745.000.000 |
| Nusa Dua, Bali | Water | ||||
| 103 | PG. Gempol Krep | PG. Gempol Krep | 2007 | Pengadaan dan Pemasangan Transformer | Rp 172.440.972 |
| 500KVA Beserta Panel & Distribusinya | |||||
| 104 | PT. Varia Usaha | PT. Varia Usaha | 2007 | Pengadaan Panel Distribusi, Box Control dan | Rp 9.508.620 |
| Junction Box | |||||
| 105 | Galaxy Mega Electric | Galaxy Mega Electric | 2007 | Capasitor Bank 720KVAR | Rp 69.000.000 |
| 106 | Mall Galaxy | PT. Sinar Galaxy | 2007 | Repair ACB 5000A 3P | Rp 14.850.000 |
| 107 | PT. Indra Kencana Nusantara | PT. Indra Kencana | 2007 | Pengadaan Kabel-Kabel | Rp 121.671.000 |
| 108 | PT. Petrokimia Gresik | PT. AJG | 2007 | Pekerjaan Instalasi Listrik Gedung Prosesing | Rp 29.250.000 |
| Benih dan Gudang Penyimpanan Benih | |||||
| 109 | PT. Varia Usaha | PT. Varia Usaha | 2007 | Panel SDP & Digital Junction Box | Rp 4.653.000 |
| 110 | PT. Gudang Garam (Gempol) | PT. KPE | 2007 | Pembongkaran & Penarikan Kabel MV & LV | Rp 32.400.000 |
| Range Engineering SKM Phase 2 | |||||
| 111 | PT. Gudang Garam (Gempol) | PT. KPE | 2007 | Pemasangan Inst. Lampu Sorot Helipad di | Rp 10.723.200 |
| Villa Pagoda | |||||
| 112 | PT. Gudang Garam (Gempol) | PT. KPE | 2007 | Pembongkaran & Pemasangan Inst. Listrik | Rp 9.854.000 |
| Conveyor Boiler Utility Phase II | |||||
| 113 | PT. Gudang Garam (Gempol) | PT. KPE | 2007 | Pemasangan Inst. Mesin Kardex Area | Rp 4.357.500 |
| Engineering Building | |||||
| 114 | PT. Gudang Garam (Gempol) | PT. KPE | 2007 | Pemasangan Inst. Power New Filling Room | Rp 14.428.000 |
| Sekar Tanjung | |||||
| 115 | PT. Binabuana Sewaka | PT. Binabuana Sewaka | 2007 | Panel Marshlling Kiosk & Junction Box | Rp 12.400.000 |
| 116 | Hotel Nusa Dua Beach & Spa | PT. TSP | 2007 | Pekerjaan Modifikasi Panel, Pengadaan dan | Rp 38.450.000 |
| Nusa Dua, Bali | Pemasangan Panel | ||||
| 117 | PT. Petrokimia Kayaku | PT. AJG | 2007 | Pek. Inst. Listrik Bio Fertilizer | Rp 16.750.000 |
| 118 | PT. Petrokimia Gresik | PT. AJG | 2007 | Pek. Perpipaan Minyak Solar & MFO untuk | Rp 105.000.000 |
| Bisnis BBM | |||||
| 119 | PT. Sandana Grhacipta | PT. Sandana Grhacipta | 2007 | Pengadaan Panel Box | Rp 1.800.000 |
| 120 | PT. Gudang Garam (Gempol) | PT. KPE | 2007 | Pemasangan Inst. Power, Penerangan & Stop | Rp 26.003.500 |
| Kontak di Ruang Compressor ESS, di Ruang | |||||
| Compressor Utility Phase I, di Ruang Utility | |||||
| Phase II, di Chiller Utility Phase I, di Gudang | |||||
| E & di Office Engineering | |||||
| 121 | PT. Aneka Jasa Grhadika | PT. AJG | 2007 | Pengadaan Panel Distribusi Plant ANB, | Rp 17.390.000 |
| Pengadaan dan Pemasangan Kabel NYFGbY | |||||
| 4x120 mm˛ | |||||
| 122 | PT. METALCO | PT. METALCO | 2007 | Pengadaan Trafo 3500KVA & 2000KVA | $ 133.750 |
| "Trafindo" | |||||
| 123 | PT. Tata Solusi Pratama | PT. TSP | 2007 | Pengadaan Power Meter "Circutor" + CT "CIC" | Rp 33.371.600 |
| 124 | PT. Behaestex - Pekalongan | PT. Varia Usaha | 2007 | Pengadaan Panel DB-1, LP-1, PP-1 s/d 8 | Rp 92.673.900 |
| 125 | Mall Galaxy | PT. Sinar Galaxy | 2007 | Repair ACB 5000A 3P "MG" | Rp 12.622.500 |
| 126 | PT. METALCO | PT. METALCO | 2007 | Pengadaan Panel Tegangan Rendah 380V | Rp 585.000.000 |
| 127 | Mall Olympic Garden | PT. Borneo | 2007 | Pengadaan Panel-Panel Mall Olympic Garden | Rp 426.758.372 |
| 128 | PT. Sandana Grhacipta | PT. Sandana Grhacipta | 2007 | Pengadaan Box Valve 2, 3, 4, 5 Gas | Rp 22.275.000 |
| 129 | PT. Gudang Garam (Gempol) | PT. KPE | 2007 | Instalasi Penerangan (Penambahan & Pemin- | Rp 3.500.000 |
| dahan) di Gudang Ess | |||||
| 130 | PT. Gudang Garam (Gempol) | PT. KPE | 2007 | Instalasi Power Listrik di Main Office | Rp 30.037.500 |
| 131 | PT. Gudang Garam (Gempol) | PT. KPE | 2007 | Instalasi Listrik Pompa untuk Jaringan Irigasi | Rp 15.530.000 |
| di Driving Range | |||||
| 132 | PT. AISK-Pontianak | PT. AISK | 2007 | Pekerjaan Elektrikal | Rp 1.941.873.000 |
| 133 | PT. Panggung Elektrik | PT. Panggung Elektrik | 2008 | Pengadaan MCCB C1251N 3P | Rp 10.890.000 |
| 134 | PT. Rajawali Solusindo | PT. Rajawali Solusindo | 2008 | Pengadaan Box Panel | Rp 2.700.000 |
| 135 | PT. KDM (ex. PT. PEN) | PT. KPE | 2008 | Pekerjaan Tray Mesin Pengolahan | Rp 115.954.500 |
| 136 | PT. KDM (ex. PT. PEN) | PT. KPE | 2008 | Pekerjaan Power Tahap I | Rp 531.128.815 |
| 137 | PT. Aneka Jasa Grhadika | PT. AJG | 2008 | Pekerjaan Modifikasi KCL Granule Menjadi | Rp 241.500.000 |
| NPK Compound | |||||
| 138 | PG. Ngadiredjo - Kediri | CV. SEJATI | 2008 | Pengadaan dan Pemasangan Saluran Distri - | Rp 3.000.000.000 |
| busi untuk Peningkatan Kapasitas RMU 6.3KV | |||||
| 139 | PT. Gudang Garam (Gempol) | PT. KPE | 2008 | Instalasi Power Mesin Maker - Packer | Rp 22.100.500 |
| (Bongkar - Pasang) | |||||
| 140 | CV. Indoteknik Utama | CV. Indoteknik Utama | 2008 | Panel Synchrone Genset + KWH Meter | Rp 28.000.000 |
| 141 | PT. Sandana Grahacipta | PT. Sandana Grhacipta | 2008 | Pengadaan Box Valve 4 Gas | Rp 1.500.000 |
| 142 | PT. Rajawali Solusindo | PT. Rajawali Solusindo | 2008 | Pengadaan Box Panel uk. 400x400x150 mm | Rp 800.000 |
| 143 | CV. Bintang Mas | CV. Bintang Mas | 2008 | Pengadaan CT & PT Outdoor 24 KV "Trafindo" | Rp 45.100.000 |
| 144 | PT. Sandana Grahacipta | PT. Sandana Grhacipta | 2008 | Pengadaan Box Valve 4 Gas & 2 Gas | Rp 2.800.000 |
| 145 | PT. Rajawali Solusindo | PT. Rajawali Solusindo | 2008 | Pengadaan Box Panel uk. 400x400x150 mm | Rp 1.860.000 |
| 146 | CV. Adyaksa Electric | CV. Adyaksa Electric | 2008 | Pengadaan Tembaga uk. 50x10 & 40x5 | Rp 14.768.000 |